The unique, patented gripper has already tens of times fastened Mobimar 18 Wind to the offshore turbine platform.
During the last two weeks Mobimar has tested the new gripper construction and the vessel herself. The highest waves at the Hyötytuuli OWF in Pori, Finland have been Hs 2.9 m with waves up to 5.2 m. Even those waves were taken smoothly by the trimaran hull. Embarkation was tested whenever the waves were under Hs < 2.5 m, and every time the embarkation has been successfully completed.