We delivered a stair tower and water slide tower modules to WhiteWater. The project was delivered with high prefabrication rate. This will now minimize our client’s on-site installation time in their turn-key delivery. Large, prefabricated modules require significant production space. Luckily modules like these don’t have to be transported longer than a stone throw from us to the port.